Infrastructure Summary

On 1 September 2011 BRC's Asset Register reported the following road lengths:

Surface Type Length
Asphalt 253.6 km
Concrete 2.4 km
Pavers 0.6 km
Sprayed Seal 1,613.6 km
None 1,123.0 km
Total 3,008.2 km
Road Type Length
Sealed 1,884.1 km
Unsealed 1,124.1 km
Total 3,008.2 km
Road Type Length
Formed 495.7 km
Gravel 621.5 km
Rural Sealed 1,288.9 km
Unformed 6.9 km
Urban Sealed 595.2 km
Total 3,008.2 km

Notes:

  1. It is probable that the length of unformed roads is significantly under reported.
  2. The difference in the total length of sealed roads reported in the above tables is due to data anomalies which are currently being investigated.
  3. This equates to approximately 11.27 million sq.m of seal.

As at August 2010 the Asset Register contained the following footpath lengths:

Surface Type Length
Asphalt 3.2 km
Bitumen 1.1 km
Brick Pavers 11.9 km
Concrete 77.3 km
Concrete Paving 0.5 km
Cracker Dust 6.7 km
Gravel 3.5 km
Total 104.1 km

Number of Buildings - Council is responsible for approximately;

  • 680 buildings and structures.

Waste Facilities Inventory Summary - Bundaberg Regional Council currently operates;

Drainage Inventory Summary - Council is responsible for the following drainage assets.

Parks Infrastructure Summary - As of 9 June 2010, there were 312 parks, beaches & natural reserves identified in BRC's maintenance management system.

Water Infrastructure Summary - BRC is responsible for:

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License